Thursday, July 30, 2015

Design 2- Project 3

So the day has come where we submit our final. The Bloomingdales armatures took route to their new vertical standings. This model consisted of plexi glass which was later cut, basswood spray painted white, museum board, and wire (optional). 
I utilized score marks solely on the plexi and some Mylar to add definition to the layers. The preparation and occupational spaces began to be visible once the basswood and museum board was added to the armature. 

Here is some process: 


The building time frame consisted of messy planning with cardboard armatures, and expensive plexi later cutting. Until we reached the building week where it all came together quite quickly.


Here is the finished product:






*The drawings were pinned up at Valencia College*

Thanks for keeping up with me!
-Michelle C. Harter

No comments:

Post a Comment