Sometime back in March 2016 a friend of mine who owns a pizza shop in Willimantic, CT expressed his interest in expanding his shop. He had goals at the time of opening new spaces for catering, another location in general, and also a patio space. During this time, he was mainly focused on the patio space since Spring was right around the corner. This pizza shop had been around for over 20 years and had created a wonderful base with the community. Their goal was to extend that community to their very own backyard- which is where they wanted the site for their patio to be. The owner had his ideas of what he wanted, how many people he would want to fit, etc. but it was easier said than done. 

I started walking around the space in their backyard, measuring, sampling, and just getting a good idea/site analysis. 







































One thing needed to be planned for was the fact that the pizza shop was commercial, but there was residential above. This being said, the surroundings around this patio-to-be space were also all residential. The town's code for building commercial-use into a residential zoned area deemed for a 3' gap between the sidewalk and obstruction (which I learned after my digital work).

Just looking at the backyard space available before actually measuring it, you would assume there was no space at all. But the 70' x ~22' space available said otherwise. 

I started designing a mass model of their property on SketchUp immediately. The accuracy of size, and different tools you can use on this program really help the messy part of the design development stage. 

Thus, the visuals were created. 









Once the owner was able to see just how much space he had to work with, the rest came and went. I was not present for the construction part of this project but they had many people helping from around the town which is exactly what they wanted to do for the community overall- bring people together. This project's construction probably took around 3 months total. Navigating through codes for a residential/commercial-use site was a daily obstacle for them during construction. But, the final product finished outstandingly. 


Construction Phase

  


















End Result



 





 Thanks for keeping up with me, 


Michelle C Harter



Wednesday, November 30, 2016

What Happens When You Move to New England

     So you were expecting Design 5 right? Well, when you leave a two year program for a 4 year program with the added engineering aspect, you gain 3 more years of fun gen ed's and accumulations of architectural engineering classes. 

     
     I decided to move away. And if I had a dollar for every time someone asked me "why the hell did you move to Connecticut", I wouldn't need to be studying to have a good job. I was so sick of Florida. I could tell you everything about every single street, and destination, and I was tired of that. I didn't want to see the same people from high school, I was over the tourists, and cast members are the devils. To summarize it, I moved because I moved. 

     The first day of class I was given a warm welcome to New England, and their educational system. From design 1 thru 4, we weren't supposed to have a base on any of our models/designs, excluding windows, doors, and wall-like additives. DAY ONE of design 4 (design 4 at my new school is on par to Valencia's design 5) I was expected to know what an elevation was, understand codes for buildings, meanings of egress, etc. I was so lost, but so happy I was where I was. I like to learn when I am under pressure. No negativity towards Valencia, but the amount of information on realistic architecture and sustainability was at a loss. One thing I can say is they are so lenient on deadlines here at UHart- I was terrified to not have my axis/models ready for Baldwin. I like have a strict timeline, and if you're not done, you are DONE. I am so very blessed that my professors at Valencia kinda forced us to hand draw/design most things, because it gave me a great upper hand. So many people in the program started off using Revit and other programs to execute ALL of their assignments. Sorry but rectangular building with the paint bucket tool for "bricks" isn't enough. Baldwin would ask you to come back next semester when you're ready to work.




     So I will leave you with my first task in "new Design 4". We were asked to design a multi-use building including retail on the first floor, incubator space on the second, and finally residential on the third. I wanted to tie together each floor with similar details even though we were told to define each different space. I wanted the building to still read as a working unit altogether. This was a very fun first assignment to do since I'm not at all used to how Northern multi-use building look/work. 
***Fun fact, not many know what mylar is up here***






     For my materials and methods class, my professor should get an award. Its probably the most informative class I have ever taken, and it saves my ass for anything I need to know code-wise, or with means of egress. The textbook has EVERY building code (northern standards), material cost, egress requirement, etc. 

     The real majority of the semester within "new design 4" involves a master plan, and building idea that is still in the works, so stay tuned.



Thanks for keeping up with me! -M